contract_codeclienttypeDescriptionLocationRemarks
VIVA -HAYAT PROJECTH TELCOMNDRC, HDD WORKSINSTALLING UPVC SLEEVES FOR FOC FROM 4" TO 12" ALL OVER KUWAITIN PROGRESS COMMENCED AUGUST 2016
MGD PROJECTPETROFAC-HEISCONDRC, HDD WORKSINSTALLING CS SLEEVES FOR PIPELINES FROM 12" TO 24" NORTH KUWAITIN PROGRESS COMMENCED AUGUST 2016
LFHO PROJECTPETROFAC-CCCNDRC, HDD WORKSINSTALLING CS SLEEVES FOR PIPELINES FROM 6" TO 40" NORTH KUWAIT, KHADMA, MAQWAA AND SEKIN PREPARATION STATUS
EWTIP NK DODSAL ENGINEERING NDRC, HDD WORKSINSTALLING CS SLEEVES FOR PIPELINES FROM 6" TO 36" NORTH KUWAIT127 CROSSINGS TOTAL ONGOING
GC31 NEW GATHERING CENTREDODSAL ENGINEERINGHDD , NDRC WORKSINSTALLING CS SLEEVES FROM 6" TO 56" DIA IN NK TOTAL 36 CROSSINGSNORTH KUWAIT -KOC80% COMPLETED
KOC/Heisco /Flow line 2009KOC/HeiscoHorizontal Directional Drilling (thrust boring)Installing of steel sleeve pipes by HDD Method from 12 inch Dia. all over KOC roads. 2 years Contract KOC (West/North Kuwait)renewed 2 yrs 2013
KOC/Algh. intl/ TL3-2010KOC/Alghanim InternationalHorizontal Directional Drilling (thrust boring)Carrying out Crossings 26” Dia. Steel SleevesPipeline TL3 to Doha power station completed 2010
MPW/KHARAFI Ntl.2010 -2011MPW/ Kharafi NationalHorizontal Directional Drilling (thrust boring)Carrying out crossing using HDD for installing ductile pipes for water var. Dia.All over Kuwait.Current
MPW/Mishref/sunint 2011MPW-MISHREF-SUNINTL CO.Micro-tunnellingInstalling polycrete sewer and storm water lines using none destructive method at depth 9 m + Dia.300mm/ 400MMAhmadi/ Mahboula area /Fintascompleted 2011
KOC/Petrofac/ KHARAFI/ Heisco 973005/c/04-2011 part BKOC/Petrofac/ KHARAFI/ Heisco Micro-tunnelingInstalling of sleeve pipes 30 inch, 48 inch, 60 inch dia. West Kuwait, Wafra, AhmadiCurrent
12
   